Workday Integration

REPORTS
  • 1. Data Sources Overview
  • 2. Business Object
  • 3. Fields Overview
  • 4. Report Writer Overview
  • 5. Report Types
  • 6. Workday Standard reports
  • 7. Developing Simple, Advanced, Search bar, Matrix Reports.
  • 8. Advance field calculations
  • 9. Custom report Types
  • 10. Sharing Reports
  • 11. Scheduling reports.
CALCULATED FIELDS
  • 1. Calculated Field Concepts
  • 2. System wide vs. Report Specific Calculated Fields
  • 3. Global Calculated Fields (e.g. Constants)
  • 4. Calculated Field Dependencies
  • 5. Available Functions, such as: Date Calculation and Formatting Functions
  • 6. Arithmetic Calculations
  • 7. String and Text Functions
  • 8. True/False Conditions
  • 9. Evaluate Expression
  • 10. Lookup related Functions
  • 11. Functions that access Related Business Objects
EIB (Enterprise Interface Builder)
  • 1. EIB Overview
  • 2. EIB Design Pattern Workday HCM Course Content
  • 3. EIB Limitations.
  • 4. Workday Public Web services overview.
  • 5. Workday Reports-as-a-Service
  • 6. Developing an Inbound EIB.
  • 7. Developing a Outbound EIB.
  • 8. Custom Report Transformation.
  • 9. EIB Features.
  • 10. Loading Customer Transactional Data into Workday using EIB’s
CORE CONNECTORS
  • 1. Overview
  • 2. Architecture
  • 3. Core Connector: Worker
  • 4. Integration System Services
  • 5. Integration System Field Attributes & Field Overrides
  • 6. Integration Maps
  • 7. Transaction Log
  • 8. Integration System Integration Attributes & Sequence Generators
  • 9. Integration Business Process
  • 10. Launching Integrations
  • 11. Overview of Document Transformation
  • 12. Workday Studio Overview
WORKDAY STUDIO IDE FUNDAMENTALS
  • 1. Workday Studio Ide Fundamentals
  • 2. Workspace
  • 3. Project Explorer
  • 4. Cloud Explorer
  • 5. Activity 1.1 – Connecting To The Cloud
  • 6. Working Area
  • 7. Viewing Area
  • 8. Help
  • 9. Deploy Studio Code
  • 10. How To Import Source Code From The Cloud Explorer
  • 11. Terminology Used In Studio And Workday
BASIC COMPONENTS IN STUDIO
  • 1. Workday-In Transport
  • 2. Connecting Components
  • 3. Synchronous And Asynchronous Mediation Comp
  • 4. Write Step
  • 5. Log
  • 6. Activity 1.2 – Create A Studio Build With An Input And Log The Contents
    • a. Csv To Xml
  • 7. Activity 1.3 – Add A Csv To Xml Component To The Csv File
    • a. Local-Out And Local-In
  • 8. Activity 1.4 – Add A Local – Out And Local – In
    • a. Splitter
    • b. Aggregator
  • 9. Activity 1.5 – Adding A Splitter
    • a. Copy Step
    • b. Store
  • 10. Activity 1.6 –Storing The Input File On The Integration Event
    • a. Put Integration Message
  • 11. Activity 1.7 –Adding An Integration Message
  • 12. Eval
  • 13. Mvel Functions
  • 14. To Look For A Specific Category By Type
  • 15. String Buffer
  • 16. Validate Expression
  • 17. Route Component
  • 18. Master Activity – Generate Two Output Files, Each For Marks Above 70% As Success And Below
  • 19. As Failed.
WORKDAY REST API
  • 1. Report As A Service (Raas)
  • 2. Activity 2.1 – Creating A Custom Report
  • 3. Activity 2.2 – Adding The Raas Rest Call To Studio
    • a. Workday-Out-Rest Transport
    • b. Steps To Identify The Extra Path Of A Report
  • 4. Activity 2.3 – Use A Splitter To Split The Report Output
  • 5. Activity 2.4 – Access Values Using Props
XSLT
  • 1. Xslt Step
  • 2. Activity 2.5 – Using Xslt In Studio
  • 3. Activity 2.6 – Using Param Variables In Xslt
AGGREGRATOR COMPONENT
  • 1. Activity 2.7 – Use An Aggregator To Merge The Files
MASTER ACTIVITY 2.8- Pass A Prompt Value To A Raas In Studio
  • 1. Training For Week 3 – Guide
  • 2. Activity 3.1 – Generate A Web Service Request For “Get Workers” Operation And Test It In Web Service
    • a. Tester With Multiple Response Group
    • b. Deduction/Earning Codes In Workday Tenant
  • 3. Activity 3.2 – Call “Submit_Payroll_Input” Web Service Operation Web Service Tester.
  • 4. Activity 3.3 - Master Activity – Call “Submit_Payroll_Input” Web
    • a. Service Operation From “Payroll” Web Service And Observe The Update In Workday.
TRAINING FOR WEEK 4 – GUIDE 4 INBOUND INTEGRATIONS
  • 1. Requirement
  • 2. Steps To Break Down The Requirement And Identify Integration Approach.
  • 3. Other Considerations
  • 4. Best Practices
  • 5. Web Services (Integration Id’S And Ref Id)
  • 6. Retrieval Service
  • 7. Activity 4.1 – Retrieve A File Through Retrieval Service And Access It In Studio
    • a. Get Event Documents
    • b. Document Iterator
  • 8. Activity 4.2 – Use A Document Iterator To Retrieve Multiple Files
    • a. Integration Attribute Services
    • b. Simple Type Parameter:
    • c. Reference Type Parameter:
    • d. Enumeration Type Parameter
  • 9. Activity 4.3 – Add An Integration Attribute
    • a. Integration Map
  • 10. Master Activity 4.4 – Create An Inbound Integration And Load The Employees Leave Information
TRAINING FOR WEEK 4 – GUIDE 4 INBOUND INTEGRATIONS
  • 1. ERROR LOGGING
  • 2. Cobra
  • 3. Global Error Handler – Unforeseen Errors.
  • 4. Message Severity
  • 5. Local Error Handler – Errors We Saw Coming Or Scenario-Driven Errors.
  • 6. Throwing Errors – Detecting The Problem
  • 7. Catching Errors
  • 8. Error Handling- Best Practices
  • 9. Master Activity 4.5 – Applying Error-Handling To The Inbound Integration

for any details

Quick Enquiry

if you have any queries please feel free to contact me